This case study is not yet published. Placeholder content only.

Commercial battery storage cabinets beside a solar array
Office / New York, NY

A Class A Manhattan office tower: solar, storage and EV on one site license.

[PLACEHOLDER — replace with real data once owner permission is secured] One-line summary of the outcome, written once the owner has approved publication.

XXX,XXX sq ft
Building size
X,XXX kW
System size
$XXX,XXX / yr
Annual NOI to owner
XXX mt CO2e
Emissions credit
01The property

[PLACEHOLDER — replace with real data once owner permission is secured] Description of the asset: vintage, floorplate, tenancy profile, roof and electrical room condition, and why the owner started looking at on-site generation.

[PLACEHOLDER — replace with real data once owner permission is secured] Second paragraph covering the constraint that shaped the design — roof area, riser capacity, landmark review, or tenant operating hours.

Building type
Class A office [PLACEHOLDER — replace with real data once owner permission is secured]
Square feet
XXX,XXX [PLACEHOLDER — replace with real data once owner permission is secured]
Utility
Con Edison [PLACEHOLDER — replace with real data once owner permission is secured]
Tariff class
SC-9 Rate III [PLACEHOLDER — replace with real data once owner permission is secured]
Occupancy
XX% [PLACEHOLDER — replace with real data once owner permission is secured]
Owner type
Private REIT [PLACEHOLDER — replace with real data once owner permission is secured]
02The structure

[PLACEHOLDER — replace with real data once owner permission is secured] Description of the deal structure: NOI Energy finances, builds, owns and operates the solar, battery and EV charging. The building or its tenants buy on-site energy under a PPA at a discount to the utility rate, and the owner receives a monthly NOI payment under a site license.

[PLACEHOLDER — replace with real data once owner permission is secured] Any deal-specific mechanics: tenant pass-through treatment, EV revenue share, or capacity market participation.

Deal terms
Term
XX years [PLACEHOLDER — replace with real data once owner permission is secured]
Escalator
X.X% annual [PLACEHOLDER — replace with real data once owner permission is secured]
Ownership
NOI Energy owns the asset [PLACEHOLDER — replace with real data once owner permission is secured]
O&M
NOI Energy, full term [PLACEHOLDER — replace with real data once owner permission is secured]
Incentive stack
Federal ITC + NY-Sun + VDER [PLACEHOLDER — replace with real data once owner permission is secured]
03The result
$XXX,XXX
Year-one NOI to owner
XX%
Peak demand reduction
XXX mt CO2e
Annual emissions avoided
$0
Owner capex
[PLACEHOLDER — replace with real data once owner permission is secured] Owner quote, used only after written permission is on file.
[PLACEHOLDER — replace with real data once owner permission is secured] Name, title, ownership entity

Quote used with the owner's written permission.

04Compliance credit

[PLACEHOLDER — replace with real data once owner permission is secured] How the on-site generation contributes against the building's Local Law 97 carbon cap, including the modeled position in the 2030–2034 compliance period and the penalty exposure avoided.

Read: Local Law 97 (NYC)

See the same math on your building

Send the address and twelve months of bills. We come back with the modeled operating case for your property.

Related case studies