Commercial HVAC upgrades, planned before the next failure plans them for you.
Heating and cooling is commonly the largest load in a commercial building and the most expensive equipment to replace.
A planned replacement leaves room to consider heat pumps, right-sizing, controls and the electrical service.

Start with an equipment register.
List every major unit with its type, capacity, age, refrigerant, service history and the meter that feeds it.
More
The register shows which units are near end of life, which are oversized, and which can be grouped into one project.
Commercial heat pumps in Connecticut and Massachusetts.
Rebate levels and terms change from year to year, so we confirm the current offer and get pre-approval from the utility before a project is priced.
Connecticut: Energize CT
Commercial heat pump incentives (air source, VRF and ground source) are open to Eversource and United Illuminating business customers.
More
The installer must be in the Energize CT Heat Pump Installer Network, and larger projects need pre-approval.
Massachusetts: Mass Save
Since July 1, 2026, every commercial heat pump project needs approval before installation.
More
Projects over 35 tons go through the electric utility as custom projects, and smaller ones receive a Rebate Commitment Letter.
Other states
Rhode Island, New Hampshire, Florida and California utilities run their own commercial programs.
More
We check what is open in the property's territory, along with financing such as C-PACE where the state allows it.
What decides whether a heat pump fits.
Heating load and climate
The building's heating load and the design temperature for the location.
More
Modern cold-climate units are designed for northern winters.
Electrical service
Converting gas heat to electric adds load, so panel and service capacity are checked first.
The tariff
Higher winter electric use changes the bill shape.
More
We model it on the actual rate, including demand.
Local rules
Some cities set building performance standards that favor electrification.
More
See our regulatory guides.
Plan HVAC with generation, not after it.
A heat pump conversion raises electric load, which changes how much solar the building can use on site, and a battery can hold back the new peak electric heating or cooling creates.
More
Planning them together avoids sizing an array for a building that is about to change.
What we evaluate on a commercial building.
Packaged rooftop units
The common setup on retail, office and light industrial roofs.
More
Heat pump rooftop units come in the same packaged format as gas-fired ones. Curb fit, roof structure and crane access are checked as part of the plan.
Split and ductless heat pumps
Suited to smaller zones, common areas, apartments and buildings without ductwork.
More
Each indoor unit is controlled separately.
Variable refrigerant flow (VRF)
One outdoor system serving many zones, used in offices, schools and mid-rise multifamily.
More
Some systems can move heat from zones that need cooling to zones that need heating.
Boilers, chillers and air-to-water heat pumps
Larger buildings with hydronic heat or chilled water.
More
Air-to-water heat pumps can take over all or part of the boiler load, sized against the supply temperatures the building's radiators and coils need.
Ventilation and energy recovery
Outdoor air is a large share of the heating and cooling load.
More
Energy recovery ventilators recover heat from exhaust air, which lets the main equipment be smaller.
Controls
Schedules, setpoints and a building automation system.
More
Fixing controls is usually the cheapest step, and it comes before any equipment is sized.
The refrigerant changes what you can buy, not what you can keep running.
Under EPA's Technology Transitions rule (AIM Act), new residential and light commercial air conditioning and heat pump systems must use a refrigerant with a global warming potential of 700 or less.
More
On May 21, 2026, EPA finalized a rule removing the January 1, 2026 installation deadline for higher-GWP equipment that was manufactured or imported before January 1, 2025, so that older stock, such as R-410A units, can be installed until it runs out.
Plan around the new refrigerants
New units use lower-GWP refrigerants such as R-454B and R-32.
More
These need different service practices and parts, so the service contract is part of the plan.
VRF has its own date
EPA's VRF rule (December 2024) allows new VRF systems built from components made or imported before January 1, 2026 to be installed until January 1, 2027.
More
The May 2026 rule did not extend that date.
Commercial refrigeration is separate
Supermarket, remote condensing unit and cold storage systems have their own limits and dates, which the May 2026 rule also changed.
More
We check them separately for food retail and warehouse sites.
What NOI checks for commercial hvac
- Equipment register: type, capacity, age, refrigerant and service history
- Heating and cooling loads for the building and climate
- Electrical service and panel capacity
- The tariff, including demand charges
- Building performance standards that apply
- Utility incentives and financing programs open in the territory
Related: Free building energy audit, LED lighting retrofits, Battery storage, Building performance standards and incentives.
Commercial HVAC: articles from the NOI blog
HVAC Upgrades and Heat Pumps: Planning the Replacement Cycle Before It Plans You
An HVAC failure in July forces a like-for-like replacement at emergency prices. A replacement planned two years earlier can change the technology, the size and the bill.
Efficiency First: Why LED, HVAC and Controls Come Before New Generation
The cheapest energy is the energy a building no longer needs. Efficiency work also shrinks the system you build next, so it belongs at the front of the plan.
Why Solar Pairs With Electrification: The Real NOI Stack for 2030-Ready Multifamily
Electrification is happening to your building whether you plan for it or not. The question is whether you're capturing the revenue or just absorbing the cost.
Commercial HVAC: common questions
When is the best time to upgrade HVAC?
+
At the end of the equipment's life, planned in advance. A failure in peak season forces a like-for-like replacement at whatever the market charges that week.
Will a heat pump raise my electric bill?
+
Electric use rises when heating moves off gas, and the bill shape changes. Whether total energy cost rises or falls depends on the tariff and the equipment, so we model it on the building's actual rate.
Can we still install an R-410A system?
+
For residential and light commercial air conditioning and heat pump systems, yes, if the equipment was manufactured or imported before January 1, 2025: EPA removed the January 1, 2026 installation deadline in May 2026. New units are built with lower-GWP refrigerants, and VRF systems built from components made before 2026 have a separate installation deadline, January 1, 2027.
How is an HVAC project funded?
+
Projects are delivered owner-funded, financed or third-party funded. Which structure applies, and who pays, owns the equipment and receives the benefit, is set in the project agreement after underwriting. Utility incentives and, in some states, financing programs such as C-PACE may apply; we confirm what is open in your territory.
More questions? Read the full FAQ or talk to us.
Get my free energy audit for commercial hvac.
Start with your property details. A utility bill is optional. A written initial review within 2 business days.
Get my free energy audit →