HVAC

Commercial HVAC upgrades, planned before the next failure plans them for you.

Heating and cooling is commonly the largest load in a commercial building and the most expensive equipment to replace.

More on this

A planned replacement leaves room to consider heat pumps, right-sizing, controls and the electrical service.

Get my free energy audit →A written initial review within 2 business days.
NOI inspecting rooftop HVAC equipment during a building energy assessment
The plan

Start with an equipment register.

List every major unit with its type, capacity, age, refrigerant, service history and the meter that feeds it.

More

The register shows which units are near end of life, which are oversized, and which can be grouped into one project.

Utility programs

Commercial heat pumps in Connecticut and Massachusetts.

Rebate levels and terms change from year to year, so we confirm the current offer and get pre-approval from the utility before a project is priced.

Connecticut: Energize CT

Commercial heat pump incentives (air source, VRF and ground source) are open to Eversource and United Illuminating business customers.

More

The installer must be in the Energize CT Heat Pump Installer Network, and larger projects need pre-approval.

Massachusetts: Mass Save

Since July 1, 2026, every commercial heat pump project needs approval before installation.

More

Projects over 35 tons go through the electric utility as custom projects, and smaller ones receive a Rebate Commitment Letter.

Other states

Rhode Island, New Hampshire, Florida and California utilities run their own commercial programs.

More

We check what is open in the property's territory, along with financing such as C-PACE where the state allows it.

Heat pumps

What decides whether a heat pump fits.

Heating load and climate

The building's heating load and the design temperature for the location.

More

Modern cold-climate units are designed for northern winters.

Electrical service

Converting gas heat to electric adds load, so panel and service capacity are checked first.

The tariff

Higher winter electric use changes the bill shape.

More

We model it on the actual rate, including demand.

Local rules

Some cities set building performance standards that favor electrification.

More

See our regulatory guides.

With solar and storage

Plan HVAC with generation, not after it.

A heat pump conversion raises electric load, which changes how much solar the building can use on site, and a battery can hold back the new peak electric heating or cooling creates.

More

Planning them together avoids sizing an array for a building that is about to change.

Equipment

What we evaluate on a commercial building.

Packaged rooftop units

The common setup on retail, office and light industrial roofs.

More

Heat pump rooftop units come in the same packaged format as gas-fired ones. Curb fit, roof structure and crane access are checked as part of the plan.

Split and ductless heat pumps

Suited to smaller zones, common areas, apartments and buildings without ductwork.

More

Each indoor unit is controlled separately.

Variable refrigerant flow (VRF)

One outdoor system serving many zones, used in offices, schools and mid-rise multifamily.

More

Some systems can move heat from zones that need cooling to zones that need heating.

Boilers, chillers and air-to-water heat pumps

Larger buildings with hydronic heat or chilled water.

More

Air-to-water heat pumps can take over all or part of the boiler load, sized against the supply temperatures the building's radiators and coils need.

Ventilation and energy recovery

Outdoor air is a large share of the heating and cooling load.

More

Energy recovery ventilators recover heat from exhaust air, which lets the main equipment be smaller.

Controls

Schedules, setpoints and a building automation system.

More

Fixing controls is usually the cheapest step, and it comes before any equipment is sized.

Refrigerant rules

The refrigerant changes what you can buy, not what you can keep running.

Under EPA's Technology Transitions rule (AIM Act), new residential and light commercial air conditioning and heat pump systems must use a refrigerant with a global warming potential of 700 or less.

More

On May 21, 2026, EPA finalized a rule removing the January 1, 2026 installation deadline for higher-GWP equipment that was manufactured or imported before January 1, 2025, so that older stock, such as R-410A units, can be installed until it runs out.

Plan around the new refrigerants

New units use lower-GWP refrigerants such as R-454B and R-32.

More

These need different service practices and parts, so the service contract is part of the plan.

VRF has its own date

EPA's VRF rule (December 2024) allows new VRF systems built from components made or imported before January 1, 2026 to be installed until January 1, 2027.

More

The May 2026 rule did not extend that date.

Commercial refrigeration is separate

Supermarket, remote condensing unit and cold storage systems have their own limits and dates, which the May 2026 rule also changed.

More

We check them separately for food retail and warehouse sites.

Before anything is priced

What NOI checks for commercial hvac

  • Equipment register: type, capacity, age, refrigerant and service history
  • Heating and cooling loads for the building and climate
  • Electrical service and panel capacity
  • The tariff, including demand charges
  • Building performance standards that apply
  • Utility incentives and financing programs open in the territory

Related: Free building energy audit, LED lighting retrofits, Battery storage, Building performance standards and incentives.

Questions

Commercial HVAC: common questions

When is the best time to upgrade HVAC?

+

At the end of the equipment's life, planned in advance. A failure in peak season forces a like-for-like replacement at whatever the market charges that week.

Will a heat pump raise my electric bill?

+

Electric use rises when heating moves off gas, and the bill shape changes. Whether total energy cost rises or falls depends on the tariff and the equipment, so we model it on the building's actual rate.

Can we still install an R-410A system?

+

For residential and light commercial air conditioning and heat pump systems, yes, if the equipment was manufactured or imported before January 1, 2025: EPA removed the January 1, 2026 installation deadline in May 2026. New units are built with lower-GWP refrigerants, and VRF systems built from components made before 2026 have a separate installation deadline, January 1, 2027.

How is an HVAC project funded?

+

Projects are delivered owner-funded, financed or third-party funded. Which structure applies, and who pays, owns the equipment and receives the benefit, is set in the project agreement after underwriting. Utility incentives and, in some states, financing programs such as C-PACE may apply; we confirm what is open in your territory.

More questions? Read the full FAQ or talk to us.