Solar carports

Solar carports put generation over the parking NOI's clients already own.

When the roof is too small, too old or too shaded, a canopy over the parking lot can carry the array instead.

More on this

It also covers the spaces and puts conduit exactly where EV chargers will go.

Get my free energy audit →A written initial review within 2 business days.
Solar carport with EV chargers over an office parking lot in coastal Connecticut
When a canopy makes sense

The parking lot is often the best site on the property.

The roof cannot carry it

Roof area, structure, age or shading limits a rooftop array.

More

A canopy is a separate structure with its own foundations.

Covered parking is worth something

Shade and weather cover for residents, staff and visitors, on a surface the property already maintains.

EV charging is coming

Running conduit and capacity to the spaces once, during canopy construction, is far cheaper than trenching twice.

More

See commercial EV charging.

What changes against a roof array

More structure, more site work, fewer roof constraints.

Foundations and structure

Canopies need foundations, steel and engineering for wind and snow loads.

More

That adds cost against a rooftop array of the same size.

Site work and permitting

Trenching to the electrical service, lighting under the canopy, drainage and local zoning or setback rules all enter the design.

Program treatment

Some state programs treat canopies differently from roof arrays, for example with a separate adder.

More

Programs and rounds change, so we confirm what is open for the site.

Connecticut

Solar carports for commercial property in Connecticut.

NOI coordinates the design, funding, construction and operation of a Connecticut carport, working with licensed installers and engineers who build it.

More

Every project names who is responsible for engineering, installation, equipment, funding and operations.

How the generation is paid

Eligible non-residential Eversource and United Illuminating accounts can enroll under the NRES tariff, as buy-all or netting.

More

NRES treats projects built entirely as canopies separately from rooftop and ground projects, so we confirm the current terms for the site.

Charging under the canopy

Conduit and capacity for EV chargers go in during canopy construction, even if ports are added later.

If the roof also fits

Many properties have both a roof and a lot.

More

We compare the two, or combine them, before anything is priced. See Connecticut rooftop solar.

Before anything is priced

What NOI checks for solar carports

  • Parking layout, circulation and the number of spaces covered
  • Soil, foundations and snow and wind loads
  • Distance from the canopy to the electrical service
  • Local zoning, setbacks and lighting requirements
  • Planned EV charging, so conduit and capacity go in once
  • State and utility program rules for canopy systems

Related: Commercial solar, Connecticut rooftop solar, Commercial EV charging, Battery storage, Multifamily properties.

Questions

Solar carports: common questions

Why choose a solar carport over a rooftop array?

+

When the roof is too small, too old, too shaded or not structurally suited, or when covered parking and EV charging are part of the plan. A canopy is its own structure, so it costs more to build than a roof array of the same size.

Can a solar carport include EV chargers?

+

Yes. Canopy construction is the best time to run conduit and electrical capacity to the spaces, even if ports are installed later as demand grows.

Who builds solar carports for commercial properties in Connecticut?

+

NOI coordinates the project, and licensed installers and engineers build it. NOI looks after design, funding, construction and operation under the project agreement, and every project names who is responsible for each part.

Who pays for a carport?

+

Projects are delivered owner-funded, financed or third-party funded. Which structure applies, and who pays, owns the equipment and receives the benefit, is set in the project agreement after underwriting.

More questions? Read the full FAQ or talk to us.

Get my free energy audit for solar carports.

Start with your property details. A utility bill is optional. A written initial review within 2 business days.

Get my free energy audit →